- UID
- 14148005
- 热情
- 1917
- 人气
- 1918
- 主题
- 28
- 帖子
- 64
- 精华
- 0
- 积分
- 1965
- 分享
- 0
- 记录
- 0
- 相册
- 0
- 好友
- 0
- 日志
- 0
- 在线时间
- 168 小时
- 注册时间
- 2023-8-24
- 阅读权限
- 20
- 最后登录
- 2024-12-6
![Rank: 9](static/image/common/star_level3.gif) ![Rank: 9](static/image/common/star_level3.gif) ![Rank: 9](static/image/common/star_level1.gif)
升级 ![](source/plugin/plbeautify/images/expl.gif) ![](source/plugin/plbeautify/images/expc.gif) 96.5% - UID
- 14148005
- 热情
- 1917
- 人气
- 1918
- 主题
- 28
- 帖子
- 64
- 精华
- 0
- 积分
- 1965
- 阅读权限
- 20
- 注册时间
- 2023-8-24
|
LIM report中写着有“hazard/special site characteristics”,看了一下是这样的,不知道是什么意思呢,求大佬解答
“
DETAILS:
Septic Tank -Soakpit-Stormwater Control
File No. or Source of Information: P.C.C.DRAINAGE
Further Details: Site is now connected to the sewage system
Hazards referring to septic tanks, catch pits, soak pits, soak holes, grease traps are a warning not to locate structures over these areas without adequate reinforcing or filling and compacting the void.
”
请问这个问题影响大吗
|
|