- UID
- 331931
- 热情
- 15506
- 人气
- 17647
- 主题
- 71
- 帖子
- 2460
- 精华
- 1
- 积分
- 17905
- 分享
- 1
- 记录
- 0
- 相册
- 1
- 好友
- 22
- 日志
- 0
- 在线时间
- 6129 小时
- 注册时间
- 2012-7-12
- 阅读权限
- 30
- 最后登录
- 2024-11-25
升级 58.1% - UID
- 331931
- 热情
- 15506
- 人气
- 17647
- 主题
- 71
- 帖子
- 2460
- 精华
- 1
- 积分
- 17905
- 阅读权限
- 30
- 注册时间
- 2012-7-12
|
大神你好,能否咨询你一个问题,lim上我看了有这些。
“The Owner shall not carry out any earthworks, nor place, erect, construct, or permit to remain on any part of the land any buildings unless stormwater mitigation measures have been carried out to the satisfaction of the Auckland Council which must include but are not limited to the following: Stormwater runoff volumes flows and timing are limited to predevelopment levels for the two and five year storm events; and rainwater is reused for toilet, laundry and gardening purposes to reduce runoff volumes and minimise water importation and backflow prevention devices are provided where mains water supply is used to top up the rainwater tank; and a rainwater reuse tank (including a debris screen around the orifice to prevent blockage) is installed to limit the rate of stormwater runoff in accordance with the design by WMH Global, titled “xxx Detention/Re-use Tank Configuration” and the design and location of all stormwater mitigation measures have received the written approval of the Auckland Council prior to construction; and the owner maintains all stormwater devices referred to herein to the satisfaction of the Auckland Council; and the owner provides to the Auckland Council at two yearly intervals from the date of 22nd April 2008 (dated Consent Notice) a report from a suitably experienced registered engineer or suitably qualified person demonstrating that: ,,the measures required to mitigate stormwater runoff are in working order as per their approved design including but not limited to any stormwater mitigation measures installed under any future building consent; and the owner shall ensure that any deficiencies in the operation of the stormwater mitigation devices are remedied to the satisfaction of the Auckland Council and left in a suitable condition to remain in service for a further two years.”
这个的意思是不是地表任何东西都不能动?比如铺砖做deck啥的都不可以是吗?内容有点长,太麻烦的话也没关系,仍然感谢。 |
|