—ALL STORMWATER RUNOFF FROM ROOFS AND PAVED SURFACES ON THE LAND SHALL BE COLLECTED AND DISPOSED OF IN A SEALED PIPE SYSTEM.
—NO EARTHWORKS ARE TO BE CARRIED OUT UNLESS SUPERVISED BY A REGISTERED ENGINEER EXPERIENCED IN GEOMECHANICS.
—TREES AND BUSH REMOVAL ONLY WITH PERMISSION FROM THE COUNCIL PLAN OF LOTS SHOWING LOCATION OF TREES TO BE MAINTAINED AND PRESERVED.
—REPORT BY FOUNDATION ENGINEERING, BASIS FOR DETAILS IN ENCUMBRANCE. REFER TO ALL COMMENTS ON THE ENCUMBRANCE AND FOUNDATION REPORT RE: DRAINAGE, FOUNDATIONS AND TREE RETENTION.
—BECAUSE OF THE STEEP NATURE OF PART OF THESE SITES THE COUNCIL,AT ANY TIME OF CONSIDERING A BUILDING CONSENT OR CONSENT FOR SUBDIVISION MAY REQUIRE ANY OR ALL OF THE FOLLOWING MEASURES. 1. A GEOTECHNICAL ASSESSMENT OF THE STABILITY OF THE LAND BY A REGISTERED ENGINEER. 2. SPECIFIC FOUNDATION DESIGN TO ANY PROPOSED BUILDING. 3. AN ENCUMBERANCE OR CONSENT NOTICE UNDER THE RESOURCE MANAGEMENT ACT TO PRECLUDE BUILDING FROM ANY AREA OF THE SITE. 4. THE ISSUE OF A SECTION 36(2) CERTIFICATE IN TERMS OF THE BUILDING ACT. 5. SPECIFIC DESIGN OF ANY SITE WORKS PROPOSED ON THE SITE. THE ABOVE MEASURES MAY PRECLUDE THE PLACEMENT OF ADDITIONAL BUILDINGS ON THE SITE OR THE CONSENT TO A SUBDIVISION UNDER THE PROVISIONS OF THE RESOURCE MANAGEMENT ACT.
—SITES MAY BE SUBJECT TO SURFACE WATER OVERLAND FLOWPATH IN HEAVY RAINFALL EVENTS. PRIOR TO ANY CONSENT TO SUBDIVISION OR BUILDING THE COUNCIL MAY REQUIRE ANY OR ALL OF THE FOLLOWING. 1) DETAILED FLOOD ASSESSMENT BY A REGISTERED ENGINEER. 2) SPECIFIC FLOOR LEVEL DESIGN. 3) THE CREATION OF AN OVERLAND FLOWPATH EASEMENT IN FAVOUR OF THE COUNCIL. 4) ISSUE OF A SEC.36 (2) CERTIFICATE IN TERMS OF THE BUILDING ACT. 5) SPECIFIC DESIGN OF ANY PROPOSED SITE WORKS. THE ABOVE MEASURES MAY PRECLUDE THE PLACEMENT OF ADDITIONAL BUILDINGS ON THE SITE OR THE CONSENT TO A SUBDIVISION OF THE LAND.
|