陌生的香港人 发表于 2016-8-6 11:11
最新22/7 出台的 Independent Hearing Panel 建議已經取消了這個限制 你說的什麼300 400 都是空地分割( ...
Chapter I 3.1 maximum density 里说的很清楚,300, 400 平米割法要符合什么条件,200 平米割的一定的大于1200 平米
1.The number of dwellings on a site must not exceed the limits specified below:
Table 1:
Zone Dwellings
Large Lot One dwelling per site
Rural and coastal settlements One dwelling per 4000m² net site area
Single House One dwelling per site
Mixed Housing Suburban
One dwelling per 400m² net site area , or
One dwelling per 300m² net site area where the requirements of clause 3.1.2 below are met, or
One dwelling per 200m2 net site area where the requirements of clause 3.1.5 below are met
Mixed Housing Urban One dwelling per 300m² net site area, or
One dwelling per 250m² net site area where the requirements of clause 3.1.3 below are met, or
No density limits apply where four or more dwellings are proposed and the requirements of clause 3.1.6 below are met
2.Within the Mixed Housing Suburban zone a density of one dwelling per 300m² applies where:
a.the site has a frontage of at least 7.5m in width for each dwelling and is the same width for the length required to accommodate the proposed density
b.each proposed dwelling is setback at least 4m and no more than 5m from the frontage of the site.
3.Within the Mixed Housing Urban zone a density of one dwelling per 250m² applies to proposed front sites where:
a.each proposed site has a frontage of at least 7.5m in width for each dwelling and is the same width for the length required to accommodate the proposed density
b.each proposed dwelling is setback at least 2.5m and no more than 5m from the frontage of the site.
4.Where three or four dwellings are proposed on a front site within the Mixed Housing Suburban or Mixed Housing Urban zone the site must be at least 15m wide:
a.at the frontage
b.for at least 80 per cent of the length of its side boundaries.
5.Within the Mixed Housing Suburban zone a density of one dwelling per 200m2 applies where four or more dwellings are proposed and the site:
a.has a minimum net site area of 1200m2
b.is at least 20m wide:
i.at the frontage of the site
ii.for at least 80 per cent of the length of its side boundaries.
6.Within the Mixed Housing Urban zone no density limit applies where four or more dwellings are proposed and the site:
a.has a minimum net site area of 1200m²
b.is at least 20m wide:
i.at the frontage of the site
ii.for at least 80 per cent of the length of its side boundaries.
7.To avoid doubt, within the Mixed Housing Suburban and Mixed Housing Urban zones the most restrictive density applies to existing and proposed rear sites.
8.Development that does not comply with clauses 1-6 above is a discretionary activity.
9.Clause 1 above does not apply where a dwelling is converted into two dwellings as a permitted activity. |
|