NZS3604对soil bearing 有要求,说是要good ground才能用
那CHCH那边如果有liquefaction潜在风险的地区建房,foundation和framing是不是都一定要请engineer啊?
建房过程中就不能再参考nzs3604了?

作者: songinator    时间: 2021-9-20 22:33:59

https://www.building.govt.nz/bui ... efaction-potential/
作者: songinator    时间: 2021-9-20 22:34:45

Understanding NZS 3604:2011 modifications
The standard NZS 3604:2011 Timber-framed buildings, and its modification for concrete slabs, is an Acceptable Solution (B1/AS1) for Building Code clause B1 Structure. If you are following B1/AS1, this nationally-applied modification requires you to reinforce all concrete slabs with ductile steel and that you only use details that require perimeter footings to be tied to the slab. You cannot use unreinforced slabs anywhere in New Zealand. You can choose an alternative means to comply with B1.

As an Acceptable Solution, it:

is suitable where there is “good ground” as defined in that Standard
applies to all regions in New Zealand as it stands, except in the Canterbury earthquake region
applies to the Canterbury earthquake region with a modification to the definition of “good ground”. The modification excludes ground subject to liquefaction or lateral spread.
The Canterbury earthquake region amendment does not yet apply nationally. This is because the potential loss of structural support due to liquefaction or lateral spread is complex and not sufficiently well defined to incorporate in the B1 Building Code clause acceptable solution or verification method.

Lessons are still being learnt from Christchurch, and work needs to be done with other Councils to provide some certainty, so that individual engineering investigations are not required for every property.

This includes:

properly specifying expected performance requirements
identifying the conditions they apply to
outlining how to assess those conditions in a practical and cost effective manner
providing cost effective construction solutions.
MBIE is researching this, and will develop proposals for consultation that would provide robust and effective support for an amended definition of good ground in locations other than the Canterbury Earthquake region. In the interim, MBIE has issued the guidance.

补充内容 (2021-9-20 21:35):
applies to the Canterbury earthquake region with a modification to the definition of “good ground”. The modification excludes ground subject to liquefaction or lateral spread.

补充内容 (2021-9-20 21:35):
applies to the Canterbury earthquake region with a modification to the definition of “good ground”. The modification excludes ground subject to liquefaction or lateral spread.
作者: songinator    时间: 2021-9-20 22:35:24

问我不就完了
作者: vowoov    时间: 2021-9-20 22:37:05

劝你还是不好在CHCH搞房产, 死定气了
作者: amykaio    时间: 2021-9-20 22:37:29

果然高手在人间,一针就见了血,哈哈哈,谢谢
作者: lodn    时间: 2021-9-20 23:06:45

没事地震塌了保险公司赔

作者: 四文鱼哥    时间: 2021-9-21 10:18:43

lodn 发表于 2021-9-20 22:06
没事地震塌了保险公司赔

EQC赔,EQC赔个屁,我见过跟EQC打官司打几年的,刚地震一两年EQC赔的还多点,现在就是找着借口由头耍滑头不赔少赔,拖着你,恶心
作者: songinator    时间: 2021-9-21 12:41:30

lodn 发表于 2021-9-20 22:06
没事地震塌了保险公司赔

现在的新房当然得符合设计标准  不然council和EQC凭什么担责任

作者: 党中央    时间: 2021-9-21 12:44:24

提示: 作者被禁止或删除 内容自动屏蔽
作者: 四文鱼哥    时间: 2021-9-25 18:27:19

稍微有点liquefaction TC2 TC3的地当然要工程师介入了