Through that a while back so not sure still the same.
I did 2 weeks, first week is stage 1 and 2. Stage 1 is basically electrical appliance test including type 1and 2.
Stage 2 is simple circuit like few lamp and a socket outlet.
You will need your usual hand tools and multi meters.
Stage 3 is ask to wire a "full" circuit including main switch board, a serials of light fitting, switch and socket. 3phase wiring output socket plus a electrical motor start circuit.
Best to have some test tools and hand/power tools. Not limited to drills, drill bits, testers.
Not too hard if you have some real experience, good luck作者: sony313 时间: 2021-5-25 10:40:23