Interior non-residential alterations
Exemption (ag) of Schedule 1
A building consent is not required for the following building work:
(ag) the alteration to the interior of any non-residential building (for example, a shop, office, library, factory, warehouse, church, or school), if the alteration does not-
(i) reduce compliance with the provisions of the building code that relate to means of escape from fire, protection of other property, sanitary facilities, structural stability, fire-rating performance, and access and facilities for persons with disabilities; or
(ii) modify or affect any specified system.
Guidance
The purpose of this exemption is to allow for non-residential buildings to be altered internally, for example the fitout of a commercial property. This exemption does not apply to residential buildings, including communal residential buildings such as hotels, retirement villages or camping grounds.
A building consent will be required if the proposed building work affects or modifies any of the following aspects so as to reduce compliance with the Building Code.
Means of escape from fire
Protection of other property
Sanitary facilities
Structural performance
Fire-rating performance
Access and facilities for people with disabilities
这里说需要
http://www.aucklandcouncil.govt.nz/SiteCollectionDocuments/buildingpropertyconsents/forms/ac2318fireprotectionpolicy.pdf
里又是这么说的
Examples of situations where an exemption maybe considered9
· A shop within a mall is changing hands and the new tenant wants to install a new shop front,
shelving and partitions. The replacement of the shop front involves a structural design for
the new glass; the work does not impact on the superstructure of the existing building
(structural or otherwise) and has been designed by a chartered professional engineer who
has supplied a PS1
按这奥克兰的说法,需要走下面这个程序
Requesting an exemption under Schedule 1 item K
Item K provides Council with the ability to exempt building work from the requirement for a building
consent.
If an owner wishes to apply for an exemption, they should use application form AC2119 Application to
request an exemption of building work under clause K of Schedule 1. The same level of information
required for a building consent is required in support of the application together with the justification
for seeking an exemption.
· a statement from a fire engineer must be provided confirming that the building work has no
effect or does not reduce the compliance of any existing fire safety features
· if an exemption is granted, an assessment of s.112 is not required
Council will review the application and grant or refuse the request accordingly; a deposit is payable at
lodgement. The full cost of reviewing and determining whether an exemption is viable is based on an
hourly rate. Please refer to the fee schedule for further information about fees and charges.
谢谢啊,总体感觉那人对我们催他有点意见,但我们实在是等了一个小时,柜台本来说的可是14分钟。
可是我查了资料发现,不报似乎也站不住脚
这里又说
Examples of situations where an exemption maybe considered9
· A shop within a mall is changing hands and the new tenant wants to install a new shop front,
shelving and partitions. The replacement of the shop front involves a structural design for
the new glass; the work does not impact on the superstructure of the existing building
(structural or otherwise) and has been designed by a chartered professional engineer who
has supplied a PS1