今天银行的人打电话说(因为我们房屋保险是在银行买的)要上网注册一下 排队 就会有人来查房 可是现在不记得那个网站了 好像是CCC的一个什么网站 请问有人知道吗?大家的房子都检查了吗?还是在等着检查?
谢谢大家
作者: Low.Rider    时间: 2010-9-11 01:56:37

没人知道吗? 没人理我, 太伤心了
作者: xli422    时间: 2010-9-11 02:06:17

大晚上的 都洗洗睡吧。。。。。
作者: Low.Rider    时间: 2010-9-11 02:08:33

哦 对啊 太晚了。。。
不过怎么有很多人家都有人去检查了 可我家没人来检查啊 奇怪
作者: KATE-M    时间: 2010-9-11 02:35:22

我也想知道 什么时候有人来查房呀?
作者: MaxPower    时间: 2010-9-11 03:04:46

http://www.ccc.govt.nz/homelivin ... aproblem/index.aspx

你说这个?
作者: Low.Rider    时间: 2010-9-11 16:06:30

朋友说填那个EQC的CLAIM REPORT就可以排队等着人来检查了,是吗?大家填了吗?
作者: 鮩譤澪    时间: 2010-9-11 17:09:29

恩 EQC
30天之内要填好
作者: 醒临    时间: 2010-9-11 17:13:32

填了,在等............................
作者: 一只蚊子    时间: 2010-9-11 18:55:27

请问如果房子表面没有损坏,但不知道是否有内伤,是不是也要填eqc的表格等查房?谢谢了
作者: 龜龜    时间: 2010-9-11 20:11:14

方正·EQC和CCC都填了!
作者: 塔罗之谜    时间: 2010-9-11 20:32:37

那租来的房子CCC回来check吗?O(∩_∩)O谢谢了
作者: 烟花三月下米粥    时间: 2010-9-11 20:34:38

到底啥步骤啊?明白人上来说说啊
作者: greentree    时间: 2010-9-11 22:13:37

Christchurch Earthquake – Advice for Building Owners (8.00pm, Wednesday 8 September 2010)8 September 2010
Owners of heritage buildings are advised not to demolish heritage listed buildings without the express written authorisation of the Christchurch City Council.
Demolition cannot be undertaken without the written approval of the Council.

There should be no pre-emptive demolition undertaken by building owners in advance of full structural assessment from a professional engaged by the building’s owner with advice from Christchurch City Council.

Civil Defence Controller Michael Aitken says “The city and the Council value our heritage buildings and will take the most constructive path to recovering them. If there is a concern about building stability, the first response will be to stabilise them if at all possible.” The city has time to take stock of the options regarding building stabilisation. “We advise commercial property owners and residents with significant buildings to use common sense and seek the advice of the Council before taking action,” he says.

Despite the circumstances, the Building Act (2004) still applies. A building consent for urgent building work can be obtained at the Emergency Operations Centre based at the Christchurch Art Gallery. These consents will be subject to safe practice conditions such as disconnecting power and drains, along with appropriate health and safety practices. Heritage conditions will apply.

A red placard means that people should not enter or occupy the building because it has been determined as unsafe. It is not a demolition order. Nor does it mean the adjacent building is ‘red’.

Buildings with a red placard require a further detailed structural assessment by a building professional engaged by the owner. That assessment must then be discussed with the Christchurch City Council’s building evaluation and inspection team to determine options.

There have also been reports that some people have misinterpreted a red placard to mean that they have 10 minutes to collect their belongings. This is not the case. Buildings with red placards are unsafe and should not be entered.

A yellow placard means the building has limited access, as noted on the placard, and further structural assessment is needed by the owner’s consultants.

The meaning of green placards, and buildings that have not yet received placards. has also been clarified.  A green placard means there has been a brief inspection only. While no apparent structural or other safety hazards have been found, a more comprehensive inspection of the exterior and interior may reveal structural or safety hazards.

It is the building owner’s or occupier’s responsibility to get further independent advice regarding the safety of any building if necessary. This is also the case for buildings with no placards.

If there is no placard on a building, owners or occupiers should check for visible damage. It is recommended that where there is concern, a registered master builder or, in the case of building integrity a structural engineer, should check the building before declaring it safe to occupy. They should then liaise with the Council about options.

Business owners with enquiries should contact the Council’s Building Evaluation Team via the Christchurch City Council call centre on (03) 941 8999 .

For more information, refer to this building assessment flow-chart: Use Full Screen view or click on the [larger view] icon in the image below


For further information, please refer to the Christchurch City Council website www.ccc.govt.nz, email info@ccc.govt.nz or phone (03) 941 8999 .
作者: greentree    时间: 2010-9-11 22:24:09

总体来说地震发生以后首先进入第一应急检查阶段就是由ccc和civil defence进行的第一阶段震后评估,发绿牌子,黄牌子,红排牌子阶段.当所有由ccc和civil defence的第一阶段检查完成牌子被发出以及一些还没有牌子的民用建筑将进入第二检查阶段,这个阶段就是专业的结构检查,必须由拥有注册工程师资格的咨询机构才有资格做出结论和报告的阶段,这个阶段的检查是由业主或者其保险公司签定的工程师来完成的检查,然后以这个检查报告为依据跟citycoucil来讨论下一步,就是进入下一个阶段,就是灾后重建,加固,维修的工程,这个时候需要执行的是正常的审批手续,就是说要按照正常的工作程序向ccc申请building  consent的等等来完成最后的工作,初了在第二阶段被认为是高度危险并且需要紧急维修的才可以及时执行building code 2001 14(1)(c)(i)条列想临时指挥所所在申请紧急building consent 进行拆除,加固的工作.
作者: greentree    时间: 2010-9-11 22:25:45

说错了应该是building code 2004才对,大家轻点扔砖头啊
作者: superman2008    时间: 2010-9-20 15:31:16

这个要顶, 不顶不行
作者: 小拖泥    时间: 2010-9-20 18:42:40

顶喽 ·~~~~~~~~~~~~~·
作者: MaxPower    时间: 2010-9-20 19:07:43

Christchurch Earthquake – Advice for Building Owners (8.00pm, Wednesday 8 September 2010)8 September 2010
Owners of heritage buildings are advised not to demolish heritage listed buildings without t ...
greentree 发表于 2010-9-11 10:13 PM



这些东西,更新在你自己的帖子里

不然很多人看不到
作者: greentree    时间: 2010-9-20 19:14:56

我的帖子都不知道沉到什么地方去了,已经打算不更新了
作者: MaxPower    时间: 2010-9-20 19:15:53

我的帖子都不知道沉到什么地方去了,已经打算不更新了
greentree 发表于 2010-9-20 07:14 PM



右上,有一个“我的帖子”

就看到了。。
作者: greentree    时间: 2010-9-20 19:20:43

知道了,但是感觉没必要在发了,大家基本上都已经能自己解决相关的问题了,就准备看到有人发帖子,就回答好了
作者: MaxPower    时间: 2010-9-20 19:22:39

你发在一起,到时候直接贴链接就好了

这类问题短期不会断
作者: greentree    时间: 2010-9-20 19:27:51

收到,我整理一下的说.谢谢提醒,我已经把签名档改过来了,呵呵




欢迎光临 新西兰天维网社区 (http://bbs.skykiwi.com/) Powered by Discuz! X2